I put this blog together because all this experience wouldn't fit on my resume!
Wednesday, September 8, 2010
New Weather Center Server Project
When the station was preparing to have a new news set installed, the Weather Center was a big part of the change. The old weather center consisted of a room with a bank of monitors, keyboards and mice connected to servers and workstations in an ajoining room. The computers sat on shelves instead of being installed in a server rack. The first phase of this project was to design and implement a new server rack. The existing servers were measured for the amount of rack units they were going to require, then I determined what size rack was needed and, using Microsoft Visio, created a schematic that placed each server in its new location. As the new Weather Center was being built I took an existing closet area that had been somewhat abandoned and redesigned it to hold the Weather Center systems. I brought in two shorter server racks and again designed where the servers would be placed. Since this new server closet area was over 20-40 ft away from the individual stations that comprised the new Weather Center I had to run new KVM, Ethernet, and serial control cabling from the new server closet to each of the Weather Center stations using overhead wiring trays and cable management.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment